A ventilation system in a building may perform only one or a few of these tasks. Among them, the function of using ventilation to remove indoor waste heat and humidity is limited, and it is limited by the state of the outdoor air.
1. Scope of application
This construction method is applicable to the rubber and plastic insulation construction of rectangular metal air ducts in various types of air-conditioning and ventilation systems.
VENTECH as Consultant of Air Grille Diffuser Production Solution, we are not only machine supplier, we can also share how to produce air grille and diffuser. Even more, we share how to do it better.
The main function of ventilation and air conditioning is to provide the oxygen needed for human breathing, dilute indoor pollutants or odors, remove pollutants generated by indoor processes, remove indoor waste heat or humidity, and provide air needed for indoor combustion. It is mainly used in households, commercial, hotel, school and other buildings.
Phenolic foam plastic is a new type of flame retardant, fireproof and low smoke insulation material. It is a closed-cell rigid foam made of phenolic resin with flame retardant, smoke suppressant, foaming agent, curing agent and other additives.
4.Implement quality inspection standards and acceptance specifications In order to ensure that the project reaches an excellent level, the quality inspection during construction should be in accordance with the "Code for Construction and Acceptance of Ventilation and Air Conditioning Engineering" (GB50243-2002) and professional construction atlas and the requirements of the construction party conduct.
1. The internal sundries were not removed before the air duct was installed
The internal and external sundries should be removed before the air duct is installed, and the cleaning and finished products should be done well. After construction, the pipe opening should be blocked in time.
The handling and loading and unloading of the air duct should be handled with care to prevent damage to the finished product. For the construction in the air duct, clean work clothes, work gloves, and work caps must be available.
Previously, we share cutting machine and welding machine for air grille diffuser production. You know only know more about VENTECH machine, you may also get new ideas on how to optimize the production technique. Apart from cut and weld process, we do assembly to finish a product. Now let’s share more!
1.Material entry preparation
(1)The materials entering the project must meet the project quality regulations and technical requirements. The steel nameplate is clearly visible, and the relevant certificates, inspection reports, and factory certificates are complete.
Guidelines for the Operation and Management of Air Conditioning and Ventilation Systems in Offices and Public Places During the Epidemic of New Coronary Pneumonia