loading

E-mail:Machine@chinaventech.com              Expert for pre insulated duct CNC cutting machine.

The operation details of the laser cutting machine

1. Observe the general safety operating regulations for cutting machines. Start the laser strictly in accordance with the laser startup procedure.

2. Operators must be trained to be familiar with the structure and performance of the equipment, and to master the knowledge of the operating system.

3. Wear labor protection equipment according to regulations, and you must wear protective glasses that comply with the regulations near the laser beam.

4. Do not process a material before it is clear whether it can be irradiated or heated by laser to avoid the potential hazards of smoke and vapor.

5. When the equipment is started, the operator shall not leave the post or be taken care of without authorization. If it is necessary to leave, the operator should stop the machine or cut off the power switch.

6. Keep the fire extinguisher within easy reach; turn off the laser or shutter when not working; do not place paper, cloth or other flammable materials near the unprotected laser beam.

7. When an abnormality is found during the processing, the machine should be shut down immediately, and the fault should be eliminated or reported to the supervisor in time.

8. Keep the laser, the bed and the surrounding area clean, orderly, and free of oil pollution, and stack the workpieces, plates, and waste materials according to regulations.

9. When using gas cylinders, avoid crushing the welding wires to avoid leakage accidents. The use and transportation of gas cylinders shall comply with gas cylinder supervision regulations. It is forbidden to explode the gas cylinder in the sun or close to a heat source. When opening the bottle valve, the operator must stand on the side of the bottle mouth.

10. Observe the high-voltage safety regulations when repairing. Every 40 hours of operation or weekly maintenance, every 1,000 hours of operation or every six months of maintenance shall be carried out in accordance with regulations and procedures.

11. After starting the machine, manually start the machine in the X and Y directions at low speed, and check whether there is any abnormality.

12. After inputting the new part program, test run it first and check its operation.

13. When working, pay attention to the operation of the machine tool to avoid accidents caused by the cutting machine going out of the effective stroke range or two collisions.

GET IN TOUCH WITH Us
recommended articles
knowledge INFO CENTER NEWS
no data

Contact Us

Tel : +86 757 29200196
Mobile : +86-189 27789653
E-mail : machine@chinaventech.com
Address : No. 3, Hongcha Road, Yinghong
Industrial Zone, Yingde, 513042, Qingyuan, Guangdong, ChinaYPE 2019

Better Touch Better Business

Contact Sales at  VENTECH.

Air Units

Call Us

+86  18927789653

Copyright © 2025 Yingde Ventech Intelligent Equipment Co., Ltd. | Sitemap
Customer service
detect